Mumbai Metro Railway
- The Mumbai Metro Railway system will cover a distance of 146km and link India’s financial and entertainment capital with its suburbs.
- The government of the of Maharashtra and the private Reliance Dhirubhai Ambani group will share the costs of the corridor with the private company picking up 74% of the tab.
- A six coach broad gauge train could have carried the same number of passengers as an eight coach standard gauge train.
- It means lower operational cost, lower electricity cost.
Chennai Metro Rail Limited
- Metro Railway System was mooted for the city of Chennai by S.Shreedharan the DMRC to the Tamil Nadu CM Jay Lalitha.
- The elevated section of the project is schedule to be operational by 2011 and the entire project is schedule to be completed by the financial year 2014-15.
- About 55% of the corridors in phase I is underground and the remaining elevated.
- The Metro Rail Project was included in the 2007-08 state government’s budget, and an amount of Rs. 50 Crores had been sanctioned for preliminary works.
- The project is estimated to cost around 14,600 Crores for the two corridors totaling 50.1km.
- The construction started in early 2009 and its expected to be fully completed by 2014.
Hyderabad Metro Rail
- Estimated cost of Rs. 12,132 Crores.
- The project Hyderabad Metro Rail is 71.16km long.
- PPP Metro Rail project to have been sanctioned by Govt. of India.
- Global consulting firm Deloitte is the constructing Co. of HMR.
- The 71km covering three high density traffic corridors of Hyderabad.
- Speeds of 34kmph on an average to 80kmph maximum.
Bangalore Metro Railway
- The total project outlay envisaged is Rs.6395 Crores.
- The project Bangalore Metro Rail is 42.3kms long.
- The project report of BML is prepared by DMRC.
- The first face of the project has commenced in 2007 and complete by 2012.
- The number of passengers expected to travel on the metro is estimated at 10.20lakhs in 2012 and 16.10lakhs in 2021.
- Phase I network to about 42km, with 40stations.
Cochin Metro Railway
- Estimated to cost Rs. 3,300 crore.
- The project cochin metro rail is 25kms long.
- The starting point of Metro rail in Cochin is in Aluva and the proposed ending point in the place called pettah.
Delhi Metro
- Operator- Delhi Metro Rail Corporation Ltd.
- Begun Operation- 24th December, 2002.
- System Length- 76.7km.
- Number of Stations- 68.
- The power supply is at 25kV AC through overhead.
- In the 2008 financial year, it had revenue of $100 million.